Offeror Name: USACE- Little Rock Dist
Contract Number : WC9127S-09-C-0055
Start/Complete Date: 1-26-2010/ 8-16-2010
Project Title/Location:Millwood Tri-Lakes. Ashtown, Arkansas
Project Type: Electrical Installation/ Trenching
Dollar Value Original Contract: $499,775.00
Dollar Value @ Completion $ 499,775.00
Role of Firm/work performed: Prime Contractor (40%self performed).Install new 200,400,& 600 amp electrical service to park area. Beards Lake,Paraloma Park, & Saratoga Park. Install feeder circuits from main distribution panel to all power pedestals.
Customer Point of Contact:
Name: A J Brown
Address: 700 W Capitol Ave. Little Rock Arkansas
Phone Number: 501-324-6974 ext 1038
Email Address a.j.brown@usace.mil
Offeror Name: Little Rock National Airport
Contract Number :100223
Start/Complete Date: 04-04-2012/07-15-2013
Project Title/Location: Little Rock Airport Baggage Inspection Conveyor System
Project Type: Electrical & Control Installation
Dollar Value Original Contract: $975,300.00
Dollar Value @ Completion $ 1.3 miliion
Role of Firm/work performed: Subcontractor. Installation of conveyor power & controls. Synchronize control wiring to airport systems.
Customer Point of Contact:
Name: Mr Larry Poort
Address: P.O Bx. 487 Tavares Fl. 32778
Phone Number: 352-343-1500 ext 3710
Email Address: Larry.poort@gtconveyor.com
Offeror Name: USACE - LITTLE ROCK DIST.
Contract Number : WC9127S-09-C-6022
Start/Complete Date: 2-23-2010/ 8-31-2011
Project Title/Location: Little Rock Air Force Base Gates. Jacksonville Arkansas.
Project Type: Electrical & Control Installation/ Trenching
Dollar Value Original Contract: $103,277.00
Dollar Value @ Completion $ 225,397.59
Role of Firm/work performed: Prime Contractor (70% self performed). Rewiring of the existing control wiring for each barrier gate,drop arms & warning lights.
Customer Point of Contact:
Name: Mr Mike Worthington
Address: 19 CES/CEPMC Little Rock Air Force Base, Arkansas
Phone Number: 501-987-7687
Email Address: Richard.Worthington.1@us.af.mil
Pine Bluff Arsenal- Pine Bluff, AR
Responsible for the installation of wiring to handle the alarm system for the entire base for the Pine Bluff Arsenal, including headquarters and all guard shacks, mp;s offices,chemical storage facititles,and igloo facilities.
Approximately thirty buildings with an approximate square footage of between 500 and 2500 for each building. Installation of wiring to handle fire suppression system and alarm system covering approximately 60, 000 square feel. Monitor and maintained power generating boilers. Coordinated and scheduled activities with Military Police, Commanding Officers, Engineers and other Electrical contractors.
Dardanelle Power Plant - Dardanelle, AR
15KV Cable Feeder Replacement from the generator to the transformer to the switchyard. Approximately 9,000 feet of cable. Removed existing cable from cable trays and pulled through new cable into cable tray using specially design and constructed on site pulley system. Refab switchgear.
Little Rock Air Force Base
Installed conduit & wiring to power ftight simulators at the Little Rock Air Force Base facility.
Rewired, demo'd and installed new wiring bringing office up to new electrical code specifications. Put in new circuits for new cubicles and office renovations.
15KW Generator replacement, troubleshooting and repair.
Overall project cost approximately 3million dollars.
University of Ark Medical Ctr, Biological Research Ctr - Little Rock, AR
New electrical installation, wire mold and bust duct installation. 15KW Generator replacement, troubleshooting and repair. Installation of
Lighting protection system.
VA Fort Root Hospital
75KW Generator replacement, troubleshooting and repair for wide replacement.
Southwestern Bell - Forrest City, AR
Southwestern Bell West Memphis, AR
Southwestern Bell - Whitehall, AR
Managed the install of Earthquake protection system, Lightning protection system ,power to run the Fire Alarm system, and the Conduit
and wiring system, which included providing appropriate bracing and grounding for panels, conduits, and lighting.
Install 75KVA Backup generators.
Supervised all Master Electricians as well as collaborated with Engineers, Architects, and Southwestern Bell personnel.
Facility consisted three floors and approximately 20,000 square feet.
Remington Mfg - Lonoke, AR
Disassembled 22 shell producing operations in the Bridgeport, CT facility and reinstalled all 22 systems in the Lonoke, AR facility.